Close Menu
Chicago News Journal
    Facebook X (Twitter) Instagram
    • Contact us
    • About us
    • Amazon Disclaimer
    • DMCA / Copyrights Disclaimer
    • Privacy Policy
    • Terms and Conditions
    Facebook X (Twitter) Instagram YouTube TikTok
    Chicago News JournalChicago News Journal
    • Home
    • US News
    • Politics
    • Business
    • Science
    • Technology
    • LifeStyle
    • Music
    • Television
    • Film
    • Books
    • Contact
      • About us
      • Amazon Disclaimer
      • DMCA / Copyrights Disclaimer
      • Privacy Policy
      • Terms and Conditions
    Chicago News Journal
    Home»Science

    NASA to look for new options to carry out Mars Sample Return program

    AdminBy AdminApril 16, 2024 Science
    Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram
    NASA to look for new options to carry out Mars Sample Return program

    WASHINGTON — NASA will seek “out of the box” ideas in a bid to reduce the costs and shorten the schedule for returning samples from Mars.

    In an April 15 briefing, agency officials announced they would solicit proposals from NASA centers and from industry on “innovative designs” to reshape its Mars Sample Return (MSR) effort after an internal review confirmed the ballooning costs of the overall program.

    That review found that the current program would cost between $8 billion and $11 billion, the same range offered by an independent assessment completed last September. To fit that into the overall planetary science budget without affecting other programs would delay the return of samples from the early 2030s to 2040.

    “The bottom line is that $11 billion is too expensive and not returning samples until 2040 is unacceptably too long,” NASA Administrator Bill Nelson said at the briefing.

    To try to reduce costs and schedule, NASA will issue a request for proposals April 16 seeking ideas on alternative approaches for the overall MSR architecture or specific elements of it, like the sample retrieval lander or Mars Ascent Vehicle (MAV) rocket that would place the collected samples into orbit. Proposals would be due to NASA May 17, with the agency issuing contracts for 90-day studies shortly thereafter.

    “I’m expecting to get everybody in high gear and that we have the answers to this by this fall,” Nelson said.

    While NASA is looking for innovative approaches, it is not necessarily looking for new technologies. “What we’re looking for is heritage,” said Nicola Fox, NASA associate administrator for science. “What we’re hoping is that we’ll be able to get back to some more traditional, tried-and-true architectures, things that do not require huge technological leaps.”

    One example she gave is technology that enables a smaller, and presumably less expensive, MAV. The studies, she said, will seek proposals that could return an unspecified number of samples, and not necessarily all the roughly 30 samples that the Perseverance rover will have on board when it completes its work.

    NASA’s hope is that the studies can significantly reduce the cost and schedule for MSR, but officials did not set a specific goal. “We’re definitely going to try,” Nelson said, adding he was counting on the expertise of NASA personnel and those in industry to find a solution.

    The goal is to do better than a revised version of the baseline architecture for MSR that NASA developed in response to the independent report last fall. That architecture would see the launch of the ESA-developed Earth Return Orbiter in 2030, slightly later than currently planned, said Sandra Connelly, NASA deputy associate administrator for science, during a town hall meeting after the briefing. That would be followed by the sample retrieval lander with the MAV in 2035, allowing samples to make it back to Earth in 2040.

    One issue is the longevity of Perseverance. Connelly said the new plan would have Perseverance complete its exploration of terrain outside Jezero Crater and return to the crater floor in 2028. Once there, it would go into a “quiescent state” until the sample retrieval lander arrived.

    Fox suggested in the town hall meeting that this baseline concept would not fly given its projected high cost. “In the current budget climate that we have, $11 billion, as the administrator said, is too much,” she said. “I wouldn’t say the entire thing is dead on arrival. What we’re looking at is how we can infuse some innovation and heritage and simplification.”

    MSR, though, will be on a fiscal diet the next two years. Fox said that NASA plans to spend $310 million on MSR in the current fiscal year, near the low end of the range offered by congressional appropriators in the final omnibus spending bill last month. That is a little less than one third of the $949.3 million that NASA originally requested for MSR in its 2024 budget proposal.

    NASA’s fiscal year 2025 budget request left funding for MSR as “TBD” or to be determined. NASA now says it will seek $200 million for the program. Lori Glaze, director of NASA’s planetary science division, said at the town hall meeting that the $200 million will come from a line for “Planetary Decadal Future” in the original budget proposal, avoiding taking money away from existing missions or research programs. It would, though, further delay new missions, like a proposed Uranus mission recommended by the latest planetary science decadal survey.

    Nelson said he has had “extensive” discussions about NASA’s MSR plans with members of Congress, including senators and representatives from California worried about the effects of the changes on the Jet Propulsion Laboratory, which laid off 8% of its workforce in February in response to reductions in spending on MSR. “They seem to be quite understanding of the predicament we’re in.”

    However, in a statement a few hours after the briefing, Sens. Alex Padilla (D-Calif.) and Laphonza Butler (D-Calif.) criticized the budget reductions. “These funding levels are woefully short for a mission that NASA itself identified as its highest priority in planetary science and that has been decades in the making,” they stated, asking Nelson “to work with Congress to better balance these cuts” to protect the JPL workforce.

    NASA officials said at the briefing and town hall that there was no discussion of suspending or even canceling MSR, citing its high ranking in the last two planetary science decadal survey among flagship-class missions. “Returning these samples from Mars is such a huge priority for us. That is why we’re doing all of these things,” Fox said.

    “Returning the samples from Mars remains an important operation,” Nelson said.

    Related

    Read the original article here

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram

    You might also be interested in...

    These Weather Photographer of the Year photos blew us away

    November 20, 2026

    ZWO Seestar S30 Plus review

    November 10, 2026

    'The first species we might be able to communicate with, interact with vocally, might be a bird': An animal researcher explains how she decoded birdsong

    November 10, 2026

    Highly active Russian volcano plays peek-a-boo with an astronaut

    November 10, 2026

    Iran war helps fuel global drop in fossil fuel emissions — but theres a catch

    November 10, 2026

    Nazca infant had rare, fatal birth defect that left her with one central eye 1,600 years ago

    November 9, 2026
    Popular Posts

    Wash. officials condemn ICE after 2 arrested boarding flight at Seattle airport

    Anthropic IPO signals beginning of a gold rush for small businesses, says biz tech CEO

    Is Zack Snyders Escape from New York Getting a Backup Director? John Carpenter Has Robert Rodriguez on Standby

    It Gets Worse Creator Breaks Down Season 1s Messy Relationships

    Signal restricts mobile screenshots as it confronts existential threat of AI surveillance | TechCrunch

    Margot Robbie to Star in The Week of Pain

    Categories
    • Books (2,464)
    • Business (3,453)
    • Events (34)
    • Film (1,069)
    • LifeStyle (2,928)
    • Music (2,803)
    • Politics (2,356)
    • Science (1,959)
    • Technology (1,824)
    • Television (3,635)
    • US News (3,300)
    Archives
    Useful Links
    • Contact us
    • About us
    • Amazon Disclaimer
    • DMCA / Copyrights Disclaimer
    • Privacy Policy
    • Terms and Conditions
    Popular Posts
    • Summit Akeso ivonescimab improves survival in Harmoni-6 trialSummit Akeso ivonescimab improves survival in Harmoni-6 trial
    • Will That ‘Good Wife’ Character Appear? Plus, Inside Fun ‘True Blood’ ReunionWill That ‘Good Wife’ Character Appear? Plus, Inside Fun ‘True Blood’ Reunion
    • 2026 is the ‘year of execution’ amid turnaround plan2026 is the ‘year of execution’ amid turnaround plan
    • Fatboy Slim, Kasabian, The Kooks, Loyle Carner lead stacked line-upFatboy Slim, Kasabian, The Kooks, Loyle Carner lead stacked line-up
    • The Most Popular Queer Romance Audiobooks on LibbyThe Most Popular Queer Romance Audiobooks on Libby
    Archives
    Categories
    • Books
    • Business
    • Events
    • Film
    • LifeStyle
    • Music
    • Politics
    • Science
    • Technology
    • Television
    • US News
    Facebook X (Twitter) Instagram YouTube TikTok
    © 2026 Chicago News Journal. All rights reserved. All articles, images, product names, logos, and brands are property of their respective owners. All company, product and service names used in this website are for identification purposes only. Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Terms of Use and Privacy Policy.

    Type above and press Enter to search. Press Esc to cancel.