Close Menu
Chicago News Journal
    Facebook X (Twitter) Instagram
    • Contact us
    • About us
    • Amazon Disclaimer
    • DMCA / Copyrights Disclaimer
    • Privacy Policy
    • Terms and Conditions
    Facebook X (Twitter) Instagram YouTube TikTok
    Chicago News JournalChicago News Journal
    • Home
    • US News
    • Politics
    • Business
    • Science
    • Technology
    • LifeStyle
    • Music
    • Television
    • Film
    • Books
    • Contact
      • About us
      • Amazon Disclaimer
      • DMCA / Copyrights Disclaimer
      • Privacy Policy
      • Terms and Conditions
    Chicago News Journal
    Home»Science

    NASA preparing for Artemis 2 rollback to fix upper stage problem

    AdminBy AdminFebruary 21, 2026 Science
    Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram
    NASA preparing for Artemis 2 rollback to fix upper stage problem

    Updated 12:15 p.m. Eastern with additional comments from Isaacman.

    WASHINGTON — Just 24 hours after setting a March 6 launch date for the Artemis 2 mission, NASA announced Feb. 21 that a problem with the Space Launch System upper stage will delay the launch.

    In a brief statement, NASA said it was preparing to roll the SLS back from Launch Complex 39B at the Kennedy Space Center to the Vehicle Assembly Building after engineers found that helium flow in the rocket’s upper stage had been interrupted.

    Helium is used to pressurize tanks in the stage, formally known as the Interim Cryogenic Propulsion Stage. NASA had not reported any issues with helium flow or tank pressurization during a second wet dress rehearsal that concluded late Feb. 19.

    NASA initially said it had not yet made a final decision to roll the vehicle back to the Vehicle Assembly Building, or VAB, and was studying options to fix the problem at the pad as well as inside the VAB. However, in a social media post, NASA Administrator Jared Isaacman called a rollback “likely.”

    In a subsequent post, Isaacman said that while several potential causes for the problem, also seen during Artemis 1, were being considered, NASA would proceed with a rollback. “Regardless of the potential fault, accessing and remediating any of these issues can only be performed in the VAB,” he stated.

    While studying repair options, workers began preparing for a potential rollback. That includes disassembling temporary work platforms that had just been installed at the launch pad for tasks such as retesting the rocket’s flight termination system. That work could not wait until Feb. 22, the agency said, because of high winds forecast that day.

    The announcement came a day after agency officials said at a briefing that they were working toward launching Artemis 2 as soon as March 6, the first day of the next launch period for the mission. That opportunity runs through March 11.

    The upper stage problem and possible rollback “will almost assuredly impact the March launch window,” NASA said.

    Isaacman stated that the rollback “will take the March launch window out of consideration.”

    At the Feb. 20 briefing, NASA cautioned that work remained to prepare Artemis 2 for a March launch, including pad activities and a multiday flight readiness review.

    “But assuming that happens, it puts us in a very good position to target March 6,” said Lori Glaze, acting associate administrator for exploration systems development.

    “I’ve got a pretty high level of confidence in the configuration that we’re in right now,” added John Honeycutt, chair of NASA’s Artemis 2 mission management team. “It’s out there at the pad. It’s going to be there at the pad until we go fly.”

    If NASA is unable to launch Artemis 2 in March, the next launch window runs from April 1 to 6. Another window opens April 30, although NASA has not disclosed additional launch opportunities beyond the end of April.

    “I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor,” Isaacman said, but noted there were “many setbacks” during the Apollo program before landing people on the moon in 1969.

    Related

    Read the original article here

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit Telegram

    You might also be interested in...

    ZWO Seestar S30 Plus review

    November 10, 2026

    'The first species we might be able to communicate with, interact with vocally, might be a bird': An animal researcher explains how she decoded birdsong

    November 10, 2026

    Highly active Russian volcano plays peek-a-boo with an astronaut

    November 10, 2026

    Iran war helps fuel global drop in fossil fuel emissions — but theres a catch

    November 10, 2026

    Nazca infant had rare, fatal birth defect that left her with one central eye 1,600 years ago

    November 9, 2026

    Did human sacrifice help lower violence? New research in Peru leaves intriguing question

    November 9, 2026
    Popular Posts

    Bruno Mars Mourns His Fathers Death: The Man That Taught Me Everything I Know

    RHONJ Fans Less Than Impressed With Season 15 Sneak Peek

    Director Steve Miner Has Shot New Friday the 13th Movie

    JPMorganChase reports cyberattack on third-party service providers

    Fantasy and Science Fiction Books Where the Rules Dont Apply – NewInBooks

    Book Riots Deals of the Day for November 19, 2026

    Categories
    • Books (2,459)
    • Business (3,450)
    • Events (34)
    • Film (1,064)
    • LifeStyle (2,924)
    • Music (2,798)
    • Politics (2,356)
    • Science (1,954)
    • Technology (1,819)
    • Television (3,630)
    • US News (3,295)
    Archives
    Useful Links
    • Contact us
    • About us
    • Amazon Disclaimer
    • DMCA / Copyrights Disclaimer
    • Privacy Policy
    • Terms and Conditions
    Popular Posts
    • Sienna Miller Just Ditched Her Jeans for Leopard PantsSienna Miller Just Ditched Her Jeans for Leopard Pants
    • Netflix grants WBD 7-day waiver to reopen deal talks with Paramount SkydanceNetflix grants WBD 7-day waiver to reopen deal talks with Paramount Skydance
    • Sam Asghari Seen For First Time Since Britney Spears Divorce, No Wedding Ring
    • Ford Motor (F) earnings Q1 2026Ford Motor (F) earnings Q1 2026
    • I used Google Translate, shamelesslyI used Google Translate, shamelessly
    Archives
    Categories
    • Books
    • Business
    • Events
    • Film
    • LifeStyle
    • Music
    • Politics
    • Science
    • Technology
    • Television
    • US News
    Facebook X (Twitter) Instagram YouTube TikTok
    © 2026 Chicago News Journal. All rights reserved. All articles, images, product names, logos, and brands are property of their respective owners. All company, product and service names used in this website are for identification purposes only. Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Terms of Use and Privacy Policy.

    Type above and press Enter to search. Press Esc to cancel.